Harrisburg, PA
Harrisburg, PA
Allentown, PA
Erie, PA
Philadelphia, PA
Pittsburgh, PA
833.PENN.DBE or (833) 736-6323  Monday - Friday 9:00 AM - 5:00PM 1821 Fulton St., ProRank Suite, Harrisburg, PA 17102
855.PRO.RANK or (855) 776-7265 Monday - Saturday 9:00 AM - 6:00PM
855.PRO.RANK or (855) 776-7265 Monday - Saturday 9:00 AM - 6:00PM
855.PRO.RANK or (855) 776-7265 Monday - Friday 9:00 AM - 5:00PM 1821 Fulton St., Suite 201A, Harrisburg, PA 17102
855.PRO.RANK or (855) 776-7265 Monday - Saturday 9:00 AM - 6:00PM

Tag

Contractors
Kevin E. Raker Construction, LLC Bids Due: January 12, 2022 by 10 am.   Project Cost Range: $1,000,000.00 – $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE: 8% Let: 01/13/2022 11:00:00 AM Structure Work: 74.00% Let Type: Scheduled Pre-Bid Meeting: None Anticipated NTP: 04/11/2022 Wage Rates: Yes Required Completion: 10/21/2022 Prequalification Requirement: Yes State Type of Work:...
Read More
Kevin E. Raker Construction, LLC Bids Due: Tuesday, January 11, 2022 by 10 am.   The project includes the rehabilitation of four existing stacked stone arch culverts and the construction of a new precast concrete box culvert.  Primary construction activities include excavation and placement of flowable backfill over the arches, cleaning/repointing/reconstructing stone masonry, construction of cast-in-place...
Read More
Keystone Pathways Mobility Partners (KPMP)-PennDOT Pathways Major Bridge P3 Outreach Events Register Now!   Session #1 Session #2  Session #3  More information Register as a Vendor Keystone Pathways Mobility Partners (KPMP) invites all diverse firms, contractors and suppliers to our series of outreach events/information sessions.  Join us to learn more about potential opportunities to work with...
Read More
Kevin E. Raker Construction, LLC Replace existing Steel pipe arch culvert with a Precast Reinforced Concrete Box Culvert on SR 92-350 (Sullivan Trail) Exeter Township, Luzerne County From Segment 0120 Offset 1874 to Segment 0130 Offset 0400. Bids Due: Wednesday, December 15 by 10 am     Project Cost Range: $500,000.00 – $999,999.99 Federal Project Status: PENNDOT...
Read More
Kevin E. Raker Construction, LLC For the improvement of a certain section of STATE HIGHWAY in CENTRE COUNTY, UNION TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0504, SECTION A05. The project being situated as follows: On State Route 0504 from Segment 0490/ Offset 1839 to Segment 0490/ Offset 2639. For the removal of the existing Single-Span...
Read More
Keystone Pathways Mobility Partners (KPMP)-PennDOT Pathways Major Bridge P3 Outreach Events Register Now!   Session #1 Session #2  Session #3  More information Register as a Vendor Keystone Pathways Mobility Partners (KPMP) invites all diverse firms, contractors and suppliers to our series of outreach events/information sessions.  Join us to learn more about potential opportunities to work with...
Read More
Jay Fulkroad and Sons Inc. REQUEST FOR QUOTE  Please see the attached detailed listing of items, as well as the required specifications for each item, for which we are requesting quotes.  We are requesting all quotes be received in our office no later than 5:00 pm on 12.8.2021 to ensure enough time to prepare and submit...
Read More
Jay Fulkroad and Sons Inc. REQUEST FOR QUOTE  Please see the attached detailed listing of items, as well as the required specifications for each item, for which we are requesting quotes.  We are requesting all quotes be received in our office no later than 5:00 pm on 12.8.2021 to ensure enough time to prepare and submit...
Read More
Jay Fulkroad and Sons Inc. REQUEST FOR QUOTE  Please see the attached detailed listing of items, as well as the required specifications for each item, for which we are requesting quotes.  We are requesting all quotes be received in our office no later than 5:00 pm on 12.15.2021 to ensure enough time to prepare and submit...
Read More
Jay Fulkroad and Sons Inc.   REQUEST FOR QUOTE  Please see the attached detailed listing of items, as well as the required specifications for each item, for which we are requesting quotes.  We are requesting all quotes be received in our office no later than 5:00 pm on 12.15.2021 to ensure enough time to prepare and...
Read More
1 2 3 4