KCI No. 203106
Project Cost Range: $1,000,000.00 – $2,499,999.99
Anticipated NTP: 02/01/2021
Required Completion: 09/01/2021
Structure Work: 75.00%
DBE: GOOD FAITH EFFORT
Wage Rates: Yes (FEDERAL WAGE RATES)
Description:
The project is for construction of a 115 ft single prestressed concrete adjacent box beam bridge, MSE retaining walls, and approach trail.
Project documents are available online for download and printing at no cost from PennBid (https://pennbid.procureware.com/home)
Or You can view and download the bid documents at the following link
***IMPORTANT***
Your quote is due in our office by 5:00 PM ON 11/05/2020. Faxed/emailed quotes and telephone quotes are acceptable; however telephone quotes must be followed by a written quote to be considered valid.
Kinsley Contacts: Edgar Aguilar at (717) 815-6938 or Barry Fauth at (717) 815-6997 or Steve March at (717) 815-7735
Please e-mail quotes to kciestimatorshighway@rkinsley.com
If you must fax your quotes our fax number is (717) 845-3111
Bid Documents:
SCHUYLKILL RIVER TRAIL BRIDGE OVER SR 724 SUBCONTRACT AND VENDOR OPPORTUNITIES (1)
SCHUYLKILL RIVER TRAIL BRDG OVER SR 724 LOCATION MAP
SCHUYLKILL RIVER TRAIL BRDG OVER SR 724 BID ITEMS